Case Study: Building Management System (BMS) Upgrade – Marlow International
Intelligent Building Controls for Enhanced Efficiency
Overview
PTM Combined Services successfully completed works on the Building Management System (BMS) at Marlow International, supporting the optimisation and commissioning of the building’s heating, ventilation and air conditioning (HVAC) systems.
The project ensured the building’s mechanical services operated efficiently while providing facilities management with improved monitoring and control.
The Challenge
The client required reliable building controls to manage multiple HVAC systems across a large commercial facility. Maintaining occupant comfort while reducing energy consumption and ensuring minimal disruption to daily operations was a key priority.
Our Solution
Our engineers carried out the necessary BMS works, integrating and commissioning the building’s mechanical systems to ensure seamless operation. Working alongside the mechanical installation team, we verified system performance, configured control strategies and tested all connected equipment.
The BMS allows facilities managers to monitor plant performance, identify faults quickly and make operational adjustments from a central interface.
Results
The upgraded control system provides improved visibility of the building’s services, enabling more efficient operation of HVAC equipment and supporting proactive maintenance. The project was delivered safely and in accordance with the client’s operational requirements.
Services Delivered
- Building Management System (BMS) Works
- HVAC Controls
- Mechanical & Electrical Integration
- System Testing & Commissioning
- Fault Diagnostics
- Energy Efficiency Optimisation